How many hours notice is required for the CSX rail bridge over the Genesee River between December 15th and March 31st?

Study for the Lake Ontario License Test. Prepare with flashcards and multiple-choice questions, each with hints and explanations. Ensure your success!

The requirement for 12 hours notice for the CSX rail bridge over the Genesee River between December 15th and March 31st is imposed to ensure that necessary precautions can be taken to ensure safety and operational efficiency during the colder months. This notice period allows the relevant authorities and crew members adequate time to prepare for the bridge's operation, as winter weather conditions can present unique challenges such as ice formation and reduced visibility.

Having a specified timeframe for notice helps ensure that all safety measures are in place, including inspections and potential adjustments in operations, to avoid accidents and keep both rail and waterway traffic flowing smoothly. It is important for boaters and operators to be aware of such regulations to ensure compliance and maintain safety standards during winter operations.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy